https://ico.org.uk/media/action-weve-taken/decision-notices/2017/2013857/fs50625810.pdf
Vexatious to ask about too lenient sentences
Information Commissioner Posted on Fri, April 06, 2018 18:34:00- Comments(0) https://blog.olliesemporium.co.uk/?p=669
- Share
Cambridge Analytica
Information Commissioner Posted on Sun, March 25, 2018 08:27:27Email sent – Sat 24/03/2018 22:58
Elizabeth Denham
FOIA REF CAMBRIDGE ANALYTICA (CA)
Dear Madam
Under protection of the FOIA please provide me with the
following information ref the subject title.
1.A copy of the ICO application for the warrant.
2.A copy of the Warrant to search CA.
3.A copy of the Method Statement for the raid
4.A copy of the Risk Assessment for the raid.
5.A copy of the invoice for the combat ICO jackets.
6.A full list of all items confiscated.
With thanks
Yours sincerely
Alan M Dransfield
- Comments(0) https://blog.olliesemporium.co.uk/?p=668
- Share
Anglian Water
Information Commissioner Posted on Fri, March 02, 2018 18:17:20Email sent – Fri 02/03/2018 08:52
Ms Elizabeth Denham
Information Commissioner
Dear Madam
Please see the following statement from the Anglian Water
Authority, who claims they have no liability for the FOIA 2000.
Such statements are, at best, misinformation and at worst published to circumvent the FOIA 2000. It beggars belief the Anglian Water
Authority would publish this statement on their website. To my
knowledge all the other water companies are in full compliance with the FOIA
2000. I expect the ICO to issue a heavy fine against the Anglian Water
Authority for their willful breach of Section 77 of the said act. Quite frankly,
I think the conduct of their CEO Peter Simpson is reprehensible.
With thanks
Yours sincerely
Alan M Dransfield
http://www.anglianwater.co.uk/about-us/information-requests.aspx
- Comments(0) https://blog.olliesemporium.co.uk/?p=667
- Share
Email to Chairman of the Grenfell Tower Fire Public Inquiry
Grenfell Tower Posted on Sun, January 14, 2018 09:19:50Email sent – 26/11/2017 13:43
Sir Martin More- Bick Chairman of the Public Inquiry
Mr Sadiq Khan MP and London Mayor
Dear Sirs
I have had more time to digest the Fire Risk Assessment
(FRA) written by Mr Carl C Stokes, not dated, not signed and not
approved. The FRA was compiled a few months before the cladding was
installed on the Grenfell Tower (GT).
This FRA does, in my view, support my claims the fire
at Grenfell Tower was foreseeable and preventable. It also supports my claims
the GT was unsafe and unfit for purpose owing to serious fire hazards based on the following irregularities:
1.The FRA did NOT include the apartment dwellings.
2. The apartment dwellings’ front doors have not been
provisioned with fire doors.
3. No mention of the PVC gas main running vertically up the
stair wells.
4. Large area of the GT not covered by the FRA.
5. Stay Put Policy Precaution – Page 5.
6. Roof access door permanently locked.
7. No reliance on external rescue eg Fireman’s Ladders – page
7.
8. The Fire service will arrange the general evacuation – page 5.
9. General communal doors were only FD30 and should have
been FD 60.
10. Risk to Life TOLERABLE page 10.
11. Housekeeping non-existent
12. Storage of flammable material – paint, glue, white spirits etc not considered dangerous.
13. The Lifts CAN Be used in the event of a fire – Page 18.
14. 20th floor door always locked to the roof.
15. The FRA claimed the walls and ceiling were NOT in good
condition – page 21.
16. The FRA claims the emergency lighting for the
emergency escape routs were N/A – page 22.
17. FRA claims the street lighting would provide adequate coverage – page 27. What happens if the street lighting is switched
off at midnight?
18. No smoke alarms in dwellings – page 25
19. No portable fire fighting equipment – page 24.
20. No testing and maintenance of fire equipment – Page
27.
21. No inspection of emergency escape route
lighting – Page 27
22. No inspection, testing or maintenance records kept.
23. No periodical inspection of any external
Eecape routes – Page 28
24. Fire Extinguishers condemned – Page 28
25. No fire training to residents.
…..
At this juncture there is no amended updated FRA when the cladding refurbishment took place,and there is still no Interim Fire
Report. The Grenfell Tower was a CATASTROPHE waiting to happen, as are
dozen if not hundreds of other high rise buildings nationwide.
For your information, action and files.
With thanks
Yours sincerely
FOIA Campaigner and Social Watchdog.
Alan M Dransfield
- Comments(0) https://blog.olliesemporium.co.uk/?p=666
- Share
Information requested on Grenfell Tower
Grenfell Tower Posted on Sun, January 14, 2018 09:13:14Email sent – Sun 26/11/2017 17:43
Kensington and Chelsea Council
Under protection of the FOIA 2000, please provide me with the
following information in PDF format:
1. A copy of the As Built Health and Safety File for
the Cladding and Refurbishment programme approx mid 2015.
2. A copy of the amended Fire Risk Assessment post
cladding refurbishment.
3. Copies of the invoices paid to Mr CG Stokes for the
Fire Risk Assessments between Jan 2010 and to Mid June 2017. I fully
realize there may well be some redactment required on this segment of my FOIA
request. .=
4. Name and address of the Public Liability Insurance
Company for the Grenfell Tower.
With thanks
Yours sincerely
Aan M Dransfield
- Comments(0) https://blog.olliesemporium.co.uk/?p=665
- Share
Lessons learnt from the Grenfell fire
Grenfell Tower Posted on Sun, January 14, 2018 09:02:55Email sent – Sun 10/12/2017 13:50
Rt Hon Theresa May Prime Minister
Rt Hon Sadiq Khan London Mayor
Dear Prime Minister and London Mayor
Next Thursday, the 14th December, it will be 6 months
since that fateful night in June 2017 when the Grenfell Fire
happened. Some 6 months post fire we have not learnt one single
Lesson. Hence, I am going to spell out several lessons learnt to prevent similar fires nationwide:
1. Interim Fire Report must be produced as a matter of
extreme urgency, eg several days or 2/3 weeks maximum on such fires. No
IFR has been provisioned to date.
2. Fire Safety Log Book must be update and
retained as per Fire Safety Act 2005.
3. Fire Risk Assessment (FRA) must be updated in line with
the Fire Safety Act 2005. No current FRA available at the Grenfell Tower.
4. All Resident Apartment/flats must be included in the Fire
Risk Assessment. At this Juncture the FRA does NOT include the
residents’ homes. This is an extremely dangerous practice.
5. Public Inquiries CANNOT meet their Terms of
Reference in the absence of FRA/Interim Fire Report and Fire Safety
Log Book.
6. The Fire Safety Act 2005 has been consistently abused
by the residents and owners of the Grenfell Tower.
7. Adequate Portable Fire Equipment should be
provided and maintained.
8. Adequate and professional fire practice training should be
maintained and recorded.
9. Police Authority needs further training how to
recover and identify victims’ bodies and maintain a body
count.
10. Lessons learned from any fire must be captured and
disseminated to all relevant parties as a matter of extreme urgency.
11. Lessons learned – procedures at the Grenfell Fire are
tantamount to criminal negligence.
For your information action and files
Alan M Dransfield.
- Comments(0) https://blog.olliesemporium.co.uk/?p=664
- Share
Private prosecution of public authorities
Grenfell Tower Posted on Sun, January 14, 2018 08:59:26- Comments(0) https://blog.olliesemporium.co.uk/?p=663
- Share
FOIA request
Grenfell Tower Posted on Sun, July 09, 2017 08:37:59Email sent – 05/07/2017 20:22
Kensington Council
Dear Mr Yu
So, how can you know my original email FOIA
request was lost? I will now submit a brand new FOIA for the Grenfell Tower fire.
Please provide me with the following details:
1. A copy of the As Built Health and Safety File for the
refurbishment works completed in 2015.
2. A copy of the Internal and External Audit Report for
the Council ISO 9000 series.
3. A copy of the approved Fire Risk Assessment for
Grenfell
4. A copy of the Kensington Council Risk Assessment for the
Grenfell Refurbishment works.
5. A copy of the tender bid process for the Grenell
Refurbishment works.
6. A copy of the Lightning protection Certificate for the
Grenfell Tower Block.
With thanks
Alan M Dransfield
On Wed, Jul 5, 2017 at 8:05 AM, Freedom of Information:
CP-ICT: RBKC <foi@rbkc.gov.uk>
wrote:
Dear
Mr. Dransfield,
Could
you re-send your FOI request to me please? It wasn’t forwarded to us when you
made the request and it doesn’t appear in the email chain.
Once
I have your request I will start processing it.
I
apologise for the delay and any inconvenience caused.
Yours
sincerely
Robin Yu
Information Governance and Management Officer
Shared ICT Service
The Royal Borough of Kensington and
Chelsea
The Town Hall, Hornton Street, London W8
7NX
Tel: 020 7938 8226
Email: robin.yu@rbkc.gov.uk | Website: http://www.rbkc.gov.uk
From: HNGMails: HS-SocSvc: RBKC
Sent: 04 July 2017 13:52
To: Yu, Robin: CP-ICT: RBKC <Robin.Yu@rbkc.gov.uk>
Subject: FW: Thank you for E-Mail
From: alan dransfield [mailto:alanmdransfield@gmail.com]
Sent: 21 June 2017 06:24
To: HNGMails: HS-SocSvc: RBKC <HNGMails@rbkc.gov.uk>
Cc: BRADSHAW Ben <BradshawBP@parliament.uk>; John BERCOW <john.bercow.mp@parliament.uk>
Subject: Re: Thank you for E-Mail
Kensington
Council
Dear
Sirs
You
have not responded to me within your stated response time. Owing to the gravity
and sensitivity of the Grenfell Tower Fire, I would be grateful, if
you would treat my FOIA request as an emergency please and fast track it.
With
thanks
Yours
sincerely
Alan
M Dransfield
On
Thu, Jun 15, 2017 at 6:04 AM, HNGMails: HS-SocSvc: RBKC <HNGMails@rbkc.gov.uk>
wrote:
Your e-mail has been received by the
Royal Borough of Kensington and Chelsea Housing Needs Department, we will reply
to you within 24 hours from the time of receipt if during the week. E-mails
sent over the weekend will be responded to on a Monday morning.
Our opening hours are
Monday to Friday 8.30am to 5.00pm
Telephone Number
: 020 7361 3008
Fax
Number:
020 7361 3718
Website
:
www.rbkc.gov.uk/housing
Reception
Address:
Kensington Town Hall
Hornton Street
London
W8 7NX
************************************************************
The Royal Borough of Kensington and Chelsea.
This e-mail may contain information which is confidential,
legally privileged and/or copyright protected. This e-mail
is intended for the addressee only. If you receive this in
error, please contact the sender and delete the material
from your computer.
************************************************************
************************************************************
The Royal Borough of Kensington and Chelsea.
This e-mail may contain information which is confidential,
legally privileged and/or copyright protected. This e-mail
is intended for the addressee only. If you receive this in
error, please contact the sender and delete the material
from your computer.
************************************************************
- Comments(0) https://blog.olliesemporium.co.uk/?p=662
- Share