Email sent – 28/07/15 0726
Mr Bradshaw
Can you explain to me why these regulations were bypassed on
the Quay climbing centre please? In particular, the hand rails safety barriers and the stairs
tread depth.
Dransfield
This blog is aimed at shaming those who ignore health and safety and those who abuse the Freedom of Information Act out of laziness, corruption or to cover up incompetence.
Email sent – 28/07/15 0726
Mr Bradshaw
Can you explain to me why these regulations were bypassed on
the Quay climbing centre please? In particular, the hand rails safety barriers and the stairs
tread depth.
Dransfield
Email sent – 31/07/15 16.59
Dear
Sirs
Please
review your decision because I do not accept your statement that the Olympic
Stadium is compliant with the BS/ EN62305/2008.
The
material being used is non conductive, ie it is made of PVC.
I
look forward to your review .
Please
be mindful that I am on record that HM the Queen has been placed in
mortal danger should she visit this Stadium.
With
thanks
Alan M Dransfield
Email sent – 01/08/15 07.08
Dear Mr Bradshaw
I understand that teachers at any Steiner School are not
required to undergo CRB checks. If that is the case, how can the schools
guarantee the safety of the children from paedophiles and other potential
dangers.
I call upon my MP to write to the Df E asking why CRB checks
are not mandatory at Steiner schools nationwide.
With thanks
Yours sincerely
Alan M Dransfield
Email sent – 02/08/15 at 08.21
Attn the Mayor of London Mr Boris Johnson. and the London
Legacy Authority(LLA)
Dear Sirs
Let’s not beat about the bush here, I claim the the London
Olympic Stadium is unsafe and unfit for purpose owing to fraud by the Balfour
Beatty Group (BBG) and in particular the Lightning Protection.
Please see the attached Lightning Risk Assessment which is
irrefutable evidence the new stadium is non-compliant with BS/EN62305/2008.
Please refer to the main four (4) Lightning Protection
criteria on page 1 of 10 and you will clearly see that 3 of the 4 criteria have
been omitted.
Moreover and more importantly, please see the date of this
so called Risk Assessment. It is dated 24th April this year, which quite frankly
beggars belief as the LRA should be conducted at Design Phase.
sIn essence, this attached documents is irrefutable evidence
the new Stadium is unsafe and unfit for purpose owing to gross criminal
negligence by the BBG and the LLA.
I would strongly recommend and suggest this stadium is
closed down and prevented from public use until a FULL LIGHTNING RISK
ASSESSMENT has been carried out.
I would be most grateful if the Mayor of London will forward
this email and attachment to the Royal Household Security Team because I
maintain this attached document is irrefutable evidence the Queen and other
Royals have been placed in mortal danger
For you information, action and files
Yours sincerely
Alan M Dransfield