Blog Image

Alan Dransfield's Blog

Freedom of Information and Health and Safety

This blog is aimed at shaming those who ignore health and safety and those who abuse the Freedom of Information Act out of laziness, corruption or to cover up incompetence.

And, there’s more…

Ben Bradshaw MP Posted on Sat, March 28, 2015 08:48:26

Email sent – 28 March 2015 08:41

Dear Mr Bradshaw

Further to my earlier complaints about the Micky Mouse flood prevention plans, I have also now learnt there is an additional footbridge planned to
connect the allotments to the existing footpath in phase 2, which beggars
belief.

There is absolutely no need for an extra pedestrian bridge which will no
doubt cost another £100k minimum.

The existing flood relief channel will be converted in a full tidal river
but there doesn’t appear to be be any boating/mooring facilities along this new
stretch, which will present serious health and safety issues for boating visitors. There
will also be no ambulance access to the current allotments. Indeed, there will
be no vehicular access to the allotments.

Has this been considered?

Yours etc

Alan M Dransfield



Flooding defences won’t defend

Ben Bradshaw MP Posted on Sat, March 28, 2015 07:24:18

Email sent – 27 March 2015 07:56

Dear Mr Bradshaw

I am sure you are aware that the new £30million flood defence works
schedule was in yesterday’s Express and Echo along with photos of before and
Aater the works.

Quite frankly, the after photographs confirm my fears that the environmental and Devon County C ouncil engineers don’t know what they are doing and under the
current plans it will not prevent floods – in particular:-

1. The photograph of the quay outside the pizza restaurant shows a flood fate from the building line to the river. This is a complete waste of time because if
the river “backs up” it will flood all the premises on the Quay.

2. At the Terra Plaza they propose a new wall approx 5 metres from the existing
wall from the Bar Venizia to the existing warehouse, which means the block of houses/flats on Haven Bank will be flooded. It would have been more practical
and cheaper to raise existing wall by 500 mm from the Wellcome Cafe to the
Exebridges. It will also result in the new climbing centre being flooded.

3. They propose to raise the footpath from the Harvester Pub for 100 metres eastward, which would leave all the premises on Haven Banks and westwards
vulnerable.

4. The houses near Clipper Quay have not been considered for
protection.

I hope the new flood works on Phase Two are superior than Phase One, which
has seen huge holes in the existing wall repaired with sandbags, which beggars
belief. In particular, the wall opposite the Climbing Tower has been repaired
in a manner of a “cowboy builder”. Photographs of this have been sent to you
recently. Sandbags are OK for temporary repairs and flood prevention, but I would not
consider sandbags as a permanent repair.

Could I suggest/recommend meeting you with these so called “engineers” to
discuss my concerns and fears?

God only knows what their proposals are for Cowley Bridge and the Mill on
the Exe, but I have seen enough of their proposals around the Quay and Haven
Banks to make me thankful I live on the 3rd floor.

With thanks

Yours sincerely

Alan M Dransfield



Prince Charles letters – cost to the public purse

Information Commissioner Posted on Sat, March 28, 2015 07:15:42

Email sent – 27 March 2015 08:52

INFORMATION COMMISSIONER OFFICE

Dear Sir

Under the protection of the FOIA 2000,please provide me with the following
information.

1. The full legal costs incurred by the ICO defending the Prince Charles case, which concluded yesterday in the Supreme Court.

2. All costs include legal fees for QC, travel, accommodation, food etc.

3. Copies of Meta Data on this case, ncluding emails and personal notes
from case officers

With thanks

Alan M Dransfield



Dransfield and One Direction

Information Commissioner Posted on Sat, March 28, 2015 07:06:44

http://www.panopticonblog.com/2015/03/27/google-and-the-dpa-rip-section-132/