Dear Mr Bradshaw
As you are aware, I have copied you in on a number of health and safety issues during the
Dawlish Sea Wall (DSW) repair programme last year, and it comes as no surprise
to me the BBC have reported yet further serious structural cracks in the DSW – quelle surprise.
As you can see I have made FOIA requests to the Office of Rail Regulator
(ORR) which were ignored.
I call upon my MP to seek a public inquiry into the DSA repair programme
and I am absolutely astonished to learn the that Network Rail conduct a monthly inspection of the DSW defence. Under the circumstance of the previous cowboy builders and negligence of NR and ORR, these inspections need to be carried out
on a daily basis.
Network Rail cannot continue these miracle escapes eg London tunnel collapse, the previous DSW collapse. It is only a matter of time before a packed
commuter train runs of of track
It might be possibly thought that both NR and ORR are complicit and covering up serious health and safefy issues on the DSW and nationwide.
With thanks
Yours sincerely
Alan M Dransfield
—————————————
Email sent – 08 March 2015 07:40
Network Rail
FOI Department.
Dawlish Sea Wall
Dear Sirs
Under protection of the FOIA 2000 please provide me with the following
information re the subject title:
1. A copy of the NR monthly report of the Sea Wall Inspection.
2. The total cost breakdown of the above.
3. A copy of the Health and Safety File for the DSW which was completed last
year.
4. A full cost breakdown of the # 3 above.
5. A copy of the Lightning Risk Assessment for the new cycle bridge near
Powderham Castle Dawlish.
6. A copy of the NR action plan of all my H&S complaints sent to Mr
Robert Beveridge in the last 5/6years.
With thanks
Yours sincerely